Elongo Shako

Profil professionnel

Elongo Shako

LOGISTIC ASSISTANT chez MONUSCO

Goma, République démocratique du Congo Transport et Logistique Logistique
0 amis 249 vues 20 ans 2 mois d'expérience 0 formations

Resume

na

Parcours professionnel

Poste actuel

LOGISTIC ASSISTANT

MONUSCO Depuis Juillet 2006 · 20 ans 2 mois

Providing strong support and pay attention to client need with aim to respond on a timely manner,
Ensuring and optimize stock space availability by analyzing racking dimension, items technical usage, visibility and accessibility and raise LT01 Bin to Bin Umoja SAP transactions,
Liaising with SCM OPS Cell for stock Place in Storage, items reception (Goods Receipt), Goods Issue (GI), Product Identity (PID) and Notification and Reservation update,
Initiating and execute picking process by collecting items as per the request, raising manual handover and scanning supporting document to Inventory management or SCM OPS Cell for Umoja transaction on daily basis,
Initiating CMR for any cargo and shipment to be sent to sectors, HUBs by Air. And later, send Pre-Shipment Alert message to the receiving sectors for update and follow up,
Liaising and track shipment with MovCon Cargo office for newly arrived and sent goods Performed Section inventory thrice a year. Frequently interaction with PCIU and R&. I
Assisting both Engineering Section Assets Management and PCIU Goma to Control and Update all the Assets in Compliance with the Umoja rule and regulation.
Looking after tools related issues within Engineering Section;
Liaising with Movcon Section on matters concerning in coming/outgoing CMR for Assets and Materials; Ensured efficient management of engineering section assets database including physical inspection and verification of entry new assets and outgoing, periodic verification and processing of assets for write-off;
Creating the Business Object of Expendable and Non- Expendables; Liaising with other sections by the coordination of Engineering section Supervisor, with PCIU for verification and correlate assets records, with R&I for verification and ensure correctness of items received and accuracy of entries in FACS;
Conducting periodic sites visits to ensure efficient utilization of projects ‘resources.
Establishing project control procedures such as projects forecast and cash flow projections.

Formation

Aucune formation renseignee.

Competences et langues

Langue

Français, Swahili ;Anglais

Parle : Très bien

Ecrit : Très bien